As we struggle with scheduling, we have had to rent equipment once again. We managed to film for 2 days back to back, and we got lots done! We also would bring equipment to school to film if we our Media Studies teacher allowed us to, which really helped. Ultimately, we only have one more scene to film until we're finished. Woo!!! I know my group member Haaniya plans on picking it up, but it's quite difficult to arranged that since she has no ride. I also struggle with the same thing. I believe Kash is planning on picking up the equipment this time instead of Abby, so I really do hope that works out!
Subscribe to:
Post Comments (Atom)
creative critical reflection (ccr)
Here is my creative critical reflection of our movie opening Irene!
-
When it came to equipment, we chose to rent from BEACON TV. Since it was free, we reached for it and rented it for a week of filming. We w...
-
In terms of lighting, we are using high key lighting with a cool blue tint. Though it isn't 3 point, we still achieved the color with 2...
-
I planned on helping my group with drawing the storyboard this time. I must say I am proud of the first page I drew. With this new storybo...
No comments:
Post a Comment